Measure a piece of drywall joint tape to that length and cut it with scissors.
Replace 1 piece of ceiling drywall sheet.
Any repair work over a large area must span.
After marrying the new and old studs measure the hole and cut a corresponding piece of drywall.
You can also patch and repair drywall using a ready made drywall patch.
Measure the length of the first drywall joint that you will retape.
Have one or two helpers hold the drywall patch in place while you fasten it to the nailing strips or joists with drywall screws.
Let the compound dry.
Take down any exposed hardware or outer paper then hang the new piece of drywall in the wall opening along the edge of the old.
Use the same procedure to attach this half piece of drywall as you used on the first row of drywall.
With up to 1 cutout per 100 sf.
When you re choosing your new drywall look for ceiling grade gypsum board for the best and safest option to replace the drywall on your ceiling.
Measure and mark the cut line at the vertical midpoint of the drywall sheet and use a utility knife to cut through the.
Remove any baseboard trim from the wall you re going to repair.
Cut each piece of tape this way.
Remove existing drywall and fasteners.
Gypsum board is much lighter than the standard wallboard which makes it safer to use for ceilings.
Crown molding is usually attached much more.
Secure to framing per manufacturer specifications.
Space the screws every 7 or 8 inches along the edges and every 12 inches in the middle of the panel.
Basic labor to replace ceiling drywall with favorable site conditions.
When cutting drywall measure out the appropriate length score the drywall with a box cutter bend and pop.
Use ceiling grade gypsum board to replace your ceiling drywall.
Then cut the remnants off the back.
Dry fit the sheetrock onto the ceiling make any adjustments you need then use 1 1 4 drywall screws to attach it to the joists.
Place the drywall ends in the center of a stud as it will ensure a strong bond and seamless wall.
Cover the repair seams with mesh tape and a layer of joint compound to help keep the tape in place.
Locate the nearest wall studs on each side of the damaged area.
Take care not to screw down too hard.
You want the ends of the original sheetrock and the new sheetrock to align horizontally e g match in flatness.