The roof is arguably the most important component of your house.
Replacing roof hip tiles.
Roof tile replacement cost roof tile replacement costs between 1 400 and 1 600 per square on average for concrete tile spanish tile and clay tile.
When leaks begin it should be repaired or replaced quickly to prevent major interior water damage and mold from growing.
How much does roof replacement cost.
The cost to replace the roof on most homes is 4 000 to 10 000 and most spend about 8 000.
You must ensure it is the same type of tile or it may not work and can result in damage even though you ve tried to repair it.
Clay tile roof cost.
This will take 1 man half a day and it can be done from a ladder.
Continue up the hip in this manner flashing over the top of each pair of hip slates.
The 10 inch step flashings then overlap each other by 2 inches.
A typical roof replacement quote will normally include the removal and disposal of up to two layers of old shingles.
The most common tile types are concrete and terracotta.
The 16 inch long hip slates are overlapped 8 inches halfway by both the overlying slates and the flashings.
To replace 5 slipped hip tiles and a hip iron all at the bottom of the hip slope.
Remove all cement and dust off tiles.
Tile roofing tends to weight a lot and will cost 1 000 more if your entire roof framing needs an upgrade to support the extra weight.
The cost can be more for larger homes homes with complex roof designs or when installing.
Here are my 6 steps to remove and correctly replace the cement under a ridge tile if you are looking to replace the cement on a gable apex then you need this page instead.
Prepare new cement 3 parts sand to 1 part cement.
We assume any old mortar comes off the tiles easily so no new ones are needed they re about a fiver each.
Ensure you have the correct replacement tile as there are many different roof tiles on the market.
It should also include the installation of new underlayment such as the 30 pound roofing felt chimney re flashing and ice and water shield at the eaves and valleys of the roof as required by the local building code.
My apprentice bedding concrete 1 3 round hip tiles.
Replace any damaged tiles ridges.
Install the slates in pairs not one side at a time.
After all it keeps water out of the building.